Case Study

Hydro Modeling - Bismarck, ND

Hydro Modeling - Bismarck, ND

Pages 1 Pages

AE2S - Hydro Modeling - Bismarck, ND Proposed East Zone 3, a newpressure zone located in the NE corner of the City of Bismarck, has experienced relatively rapid domestic growth during the past few years. The rapid growth in this area resulted in unacceptably low water pressure and subsequent complaints from the local residents, as well as low fire flow capabilities and inadequate storage. This problem was pronounced to the extent that two privately owned booster stations were constructed in an effort to sustain adequate pressure. As such, it was possible that further development and expansion would be precluded without infrastructure improvements to address the water pressure, fire flow, and storage issues. The situation prompted the City to respond by accelerating the design and construct