Case Study

Bismarck Water Treatment Facility Control System

Bismarck Water Treatment Facility Control System

Pages 2 Pages

Bismarck Water Treatment Facility Control System Needs Assessment City of Bismarck, ND Results of the 1998 Master Plan Update for the Bismarck Water Treatment Facility (BWTF) indicated that the control system required replacement to perform at the level necessary for the plant. As such, the City enlisted AE2S to complete a detailed Needs Assessment for the facility control system. The first task of the Needs Assessment consisted of documenting the entire system, including instrumentation, PLC components and programs, valve actuators, motors starters, control loops, power circuits, devices, and the physical locations of all documented items. Once this data was gathered, the facility operators were interviewed to begin determining the level of control, monitoring, and other related system fe