Case Study

Hulcher Services Inc. Restores Safety, Speed To Saturated Right-Of-Way

Hulcher Services Inc. Restores Safety, Speed To Saturated Right-Of-Way

Scope The railroad had a serious problem with soil saturation in various spots along a 150-mile stretch of their track across one Midwestern state. With- out suf? cient drainage, rain water saturated the soil under and around the rails, destabilizing the track to potentially dangerous levels. As a result, the railroad was forced to reduce their trains’ speeds in this area to as little as 10 mph. In addition, the poor drainage problem began t

Join for free to read