Case Study

Hulcher Services Engineers Solution To Reuse Rail For Grade Stabilization

Hulcher Services Engineers Solution To Reuse Rail For Grade Stabilization

Scope The railroad was concerned about a 100-foot stretch of track along a highway where the embankment was crumbling into the road. They quickly determined that grade stabilization was needed, and proposed a unique solution: they would use pieces of recycled rail to stabilize the soil rather than invest in new H-beams or sheet pile. The railroad looked to Hulcher Services to assist with this unconventional approach to lift and drive recyc

Join for free to read