Case Study

How using KPI for condition based PM can achieve big cost savings

How using KPI for condition based PM can achieve big cost savings

Pages 1 Pages

Performance Improvement Report USA Office ? 110 East Jackson St. ? PO Box 773 ? We st Unity ? OH ? USA ? 43570 Canada Office ? 4380 South Service Rd. ? Burlington ? ON ? Canada ? L7L 5Y6 Phone: 888.632.5410 ? Fax: 888.632.5171 ? www.zimma rk.com Client: Automotive Parts Manufacture Location: Tennessee Report: CI-216 How using KPI for condition based PM can achieve bi g cost savings Problem: In an effort to minimize coolant related process pe rformance and HS&E risk, this client was using an a ggressive PM program to maintain the condition of their systems. Objectives: Move to a data driven condition based program that identifies the specifi c KPI’s and KPI limits that impact process performa nce on a machine by machine ba

Join for free to read