Case Study
Hochiki Italia Reaches New Heights At The HTM Hybrid Tower
The 19 floors of the HTM Hybrid Tower are comprised of commercial offices, a beauty centre and residential and retail environments, as well as dining and garage spaces. Comin Impianti srl, a local civil and industrial systems installer, was selected to specify solutions which would meet the needs of such a versatile building. The installers chose to specify Hochiki fire detection systems which would suit each of the different environments within the tower. Working closely with Comin Impianti srl, Hochiki Italia identified a need to use solutions that could be networked with one another via multiple control panels, programmed in a way so that each device is interconnected. It was also essential that the system was capable of identifying issues and reasons for alarm quickly, to give