Case Study

Highways England £1.6m tunnel lining repair project - Alltask removed the asbestos backing boards from the vitreous enamelled panels.

Highways England £1.6m tunnel lining repair project - Alltask removed the asbestos backing boards from the vitreous enamelled panels.

Pages 2 Pages

Alltask Limited Alltask House, Commissioners Road Rochester, Kent ME2 4EJ 01634 298000 enquiries@alltask.co.uk www.alltask.co.uk Scaffolding Asbestos Insulation CLIENT Project Particulars: The fi rst Dartford Tunnel opened in 1963, the second in 1980 and the QE2 Bridge in 1991 completing the “Dartford Crossing” as we know it today. With over 160,000 crossing every day this is now one of the busiest roads in Britain. As part of the Connect Plus Services for Highways England £1.6m tunnel lining repair project Alltask were contracted to remove the asbestos backing boards from the vitreous enamelled panels. All internal panels of the 1400m East Tunnel were to be removed, wrapped, then transported to an enclosure outside the tunnel to begin removal of the backing board under fully

Join for free to read