High Flow Bypass Saves Customer Millions Per Day PUMPS • TANKS • FILTRATION • PIPE • SPILLGUARDS 800 742 7246 rainforrent.com BACKGROUND A major chemical manufacturer in the Southeast required a 34,000 GPM bypass of their cooling discharge lines so they could continue operations during a pipeline rehabilitation project at the plant. The plant was scheduled to perform their first large diameter CIPP project to rehabilitate two cooling discharge lines. The lines carry filtered water from a river that is used for cooling, then discharged. The plant had to remain operational during the bypass as it would cost $1M for every day not operating. OUTCOME Rain for Rent provided three separate pumping locations and road crossings throughout the 22 day, round-the-clock bypass. The three bypa