More Efficient Pumps and System Design Saves Customer Money on 65 MGD Bypass

More Efficient Pumps and System Design Saves Customer Money on 65 MGD Bypass

Pages 1 Pages

More Efficient Pumps and System Design Saves Customer Money on 65 MGD Bypass PumPs • Tanks • FilTraTion • PiPe • sPillguards 800 742 7246 rainforrent.com BACKGROUND Construction on the Missouri River Wastewater Treatment Plant to separate the Combined Sewer Overflow (CSO) began in 2012 and is schedule to be completed in 2017 . Phase two of the project required eight bypass systems per year that would overlap and repeat during a three-year period. Each set of installations would run from October through March. Tight time constraints required the pump provider to perform effectively. OUTCOME Rain for Rent won the bid to provide pumps for the multi-year, multi-phase system. Thirty-three pumps ranging in size from 30-inches to 6-inches met the 65 MGD peak flow required by the job. HI