Case Study

Heli-Portable SRU

Heli-Portable SRU

AMC MINERALS // HELI-PORTABLE SRU $9,100* TOTAL SAVINGS PER HOLE/RIG (8 DA Y TRIAL PERIOD) UP TO $4,000 SAVINGS IN MUD WASTE DISPOSAL $2,500 SA VINGS FROM REDUCED ENVIRONMENT AL COSTS 60% REDUCTION IN WATER USAGE $1,800 SAVINGS FROM INCREASED OPERATIONAL EFFICIENCIES 70% REDUCTION IN DRILLING FOOTPRINT 79% REDUCTION IN MUD USAGE 20 MINUTES SET UP TIME Accessibility and environmental impact presented an expensive challenge for the

Join for free to read