Case Study

Hard Rock Reaming Success for Turborunner Oman : 5” Turborunner Reams 500 Ft Through High Stress Sandstone, Lands Liner at TD

Hard Rock Reaming Success for Turborunner Oman : 5” Turborunner Reams 500 Ft Through High Stress Sandstone, Lands Liner at TD

© 2013 Deep Casing Tools Case history Hard rock reaming success for Turborunner Oman : 5” Turborunner reams 500 ft through high stress sandstone, lands liner at TD Objectives • Run 4 ½” Liner to depth in Harmel Well through high stress sandstone • Reamed though 500’ of trouble zone • Cement as per the program Well Background and Challenges • Offset wells had stuck BHAs • Vertical side tracked 5 7/8” hole ; dogleg round fish • T

Join for free to read