Case Study

Hallmark Crown Center

Hallmark Crown Center

The Challenge The Hallmark Crown Center’s dramatic tensile canopy provides an all- weather walkway for visitors entering the Sealife Center and Legoland. Inspired by the ocean, the customised ‘Wave’ tensile fabric structure is fully supported by the buildings steel framework, offering an unobstructed dry space for visitors to line up to enter the venue. The plaza in front of the building sits on top of an underground parking lot. As a result, the fabric structure could not be fixed to the concrete floor. The challenge was engineering the 177’ by 12’ span structure to cantilever from the building’s steel frame without touching the ground. The tensile canopy also required special movement joints to allow it to flex under wind and snow loads. The Solution Because there was an existing tensile

Join for free to read