Gypsum board production process - Significant Savings Through Replacement Of A KG2 Gas Turbine With A State Of The Art OP16 Gas Turbine
Gypsum board production process - Significant Savings Through Replacement Of A KG2 Gas Turbine With A State Of The Art OP16 Gas Turbine
Application: Electricity and Direct Drying Output: Electricity: 1.8 MWe Hot Air: 8.7 kg/s at 575°C Benefits: 88% Total Efficiency 600 k€ Saved Per Year Industrial & Commercial At A Glance Significant Savings Through Replacement Of A KG2 Gas Turbine With A State Of The Art OP16 Gas Turbine SUCCESS STORY Installation: 1 X OP16-3A July 2014 Location: Delfzijl, Netherlands. Customer: SINIAT BV The gypsum board production process at SINIAT re- quires a continuous supply of 5.8 MWth heat and 1.8 MWe electric power. SINIAT operated a KG2 gas turbine with low electrical efficiency 14%, delivering only 1.1 MWe electricity. They wanted higher electrical efficien - cy along with high temperature heat. SINIAT wanted to install the gas turbine in the same area as the exist- ing KG2 gas turbi