Case Study

Extending The Life Cycle Of An Existing Energy Solution By Replacing KG2 Gas Turbines With OP16 Gas Turbines - Offshore Oil, Gas Production

Extending The Life Cycle Of An Existing Energy Solution By Replacing KG2 Gas Turbines With OP16 Gas Turbines - Offshore Oil, Gas Production

Pages 1 Pages

Application: Offshore Oil, Gas Production Output: Electricity: 7.2 MWe Benefits: 7% Improvement On Energy Efficiency 2.49 Million USD Saved Per Year 30 - 40% Reduction of Emissions Oil & Gas At A Glance Extending The Life Cycle Of An Existing Energy Solution By Replacing KG2 Gas Turbines With OP16 Gas Turbines SUCCESS STORY Installation: 4 X OP16-3A 2007 Location: Indonesia Customer: Pertamina Pertamina is an Indonesian state-owned oil and natural gas corporation based in Jakarta. To assist with on board power generation, they had existing KG2 gas turbines installed. However, after some time Pertamina found that this equipment no longer met the demands of their business. They required improved reliability with quick access to field service support to assist with downtime a

Join for free to read