Ground movement assessment to optimize the retaining wall design and to comply with Network Rail requirements.

Ground movement assessment to optimize the retaining wall design and to comply with Network Rail requirements.

London & Midlands 0207 206 2576 01788 211778 North & Scotland 01423 589500 admin@RemedyGeotechnics.com Leave the ground to us! www.remedygeotechnics.com Follow Us @RemGeotechnics Contact Remedy Geotechnics - we ’ll give you an answer every time. CASE STUDY The development of a brownfield site for new residential properties. The development required excavation of a sloping site to form a 4.5m high cantilever retaining wall supporting a live railway embankment. Ground movement assessment to optimize the retaining wall design and to comply with Network Rail requirements. The construction of this brownfield site requires the demolition of existing structures for the new construction of a 4 storey residential development situate