Case Study

Grinder Saves The Day At Shickshinny Sewage Treatment Plant

Grinder Saves The Day At Shickshinny Sewage Treatment Plant

Pages 2 Pages

Case Study: Grinder Saves The Day At Shickshinny Sewage Treatment Plant The Borough of Shickshinny Sewer Plant faced a major operational problem. The plant, which has been in operation since 1979, services mostly residential areas, parts of two boroughs and a neighboring prison. It uses an activated sludge, secondary treatment process to process 500 MGD. Even though Shickshinny’s plant had a grinder located in front of the pumps, their pum

Join for free to read