Case Study
TASKMASTER® Grinder Saves Over $36,000 For Kirksville, Mo.
Case Study: TASKMASTER® Grinder Saves Over $36,000 For Kirksville, Mo. The City of Kirksville, Mo. had a problem. Their 25-year-old Smith and Loveless comminutor suddenly stopped working and could not be repaired. Their main bar screen could not handle the complete flow of the plant headworks at daily peak periods which meant that unreduced solids could get into the plant’s downstream equipment and cause severe operational difficulties