Case Study
Grenadier House
Case Study: Grenadier House Client: Consulting Engineer: Services Provided: Location: Value: Year: www.van-elle.co.uk 01773 580580 info@van-elle.co.uk Overvi e w The re-development of the former offices for the Ministry of Jus- tice in Westminster. The development is a multi level residential block with basement structure. A relatively small site with a re- stricted access (rig unloaded off site and tracked in) and tightly positioned perimeter piles in close proximity to third -party struc- tures and boundary limits. The site was fully demolished prior to pile commencement with temporary propping required for the removal of significant pre - existing structural remnants. The depth of the piles required a large CFA rig but the dim