INTRODUCTION As a part of the Green Mountain Coffee Roasters Williston facility expansion, a series of heavily-loaded tank foundations were required for the new Wastewater Pretreatment system. The tanks covered an approximate area of 42-ft by 48-ft and were positioned immediately adjacent to the existing plant. GEOTECHNICAL CONDITIONS A 12-foot thick crust of medium dense sand and silt was encountered at the site. However, the medium dense