Case Study

Bigelow Brook Pedestrian Bridge

Bigelow Brook Pedestrian Bridge

Pages 2 Pages

introduction The project involved support of a new 175-foot long Contech pedestrian bridge as a part of the Cheney Rail Trail with support provided by abutments located on the North and South (former railroad) embankments. Abutments measuring 8-ft wide and 16-ft long were loaded to 18.6 kips per foot vertically and 1.3 kips per foot laterally. GEotEcHnicAL conditionS The subsurface conditions at the abutment locations generally consist of und

Join for free to read