Case Study: Gospel Oak to Barking Electrification Project Client: Consulting Engineer: Services Provided: Location: Value: Year: www.van-elle.co.uk 01773 580580 ashley.gierth@van-elle.co.uk Gospel Oak to Barking Electrification project Van Elle was appointed by Murphy Group Ltd to install 22no piles to a depth of 4.8m for the foundations of the overhead powerline gantries. The piles required casing through the ballast layer with design depth finishing in the London Clay. The foundations were installed with Movax and BSP attachments on our fleet of Colmar RRV ’s. In addition Van Elle also designed, manufactured and installed bespoke precast units on which the stanchions and key clamp edge protection could be seated. Further wor