Go Air Swansea- lux levels were raised by at least 50% while the energy consumed was reduced by nearly 70%
Go Air Swansea- lux levels were raised by at least 50% while the energy consumed was reduced by nearly 70%
Case Study energy solutions [Go Air - Swansea] 35a Victoria Road East Thornton Cleveleys FY5 5BU 01253 283050 enquiries@airisuk.com www.airisuk.com Airis Energy Solutions UKCase Study: Go Air - Swansea Background Airis LED Solution After a detailed survey and a dialux, our specialist install team decided to change the configuration of the new lighting. This gave the client even more savings and a much improved spread of light. Building Data Location: Swansea Surface Area: Business Model57 - 250W Son lights 14 – 150W External Flood lights Annual cost: £8238.62 Previous Situation Airis LED Solution Actions Performed • Feasibility evaluation visit. • Measurement of lighting levels before and after installation. • Diialux CAD design. • Replacement of all fluorescent tubes by SmartLED AI