Case Study
Glyphaloy AMT Saved Operator 2 Days of Milling Time
Case History A major operator in North Dakota was drilling an unconventional oil well in the Bakken shale. After drilling the deviated horizontal wellbore, the operator ran 4½-in. 11.6 lb/ft casing to depth and prepared the wellbore for fracturing. A plug and perf-style completion method was used to complete the well. As part of the completion process, one composite bridge plug and 47 Baker Hughes 360 QUIK Drill ™ generation 3 compo