Glenfiddich Distillery, Dufftown - basement retention

Glenfiddich Distillery, Dufftown - basement retention

Pages 2 Pages

www.technikgs.com Case study LOCATION REQUIREMENT TECHNIQUES MAIN CONTRACTOR Project Overview The expansion of the existing distillery required an embedded piled retaining wall immediately adjacent to the live plant to facilitate the construction of the new extension. Micropiles were used to form this wall due to the proximity and sensitivity of the process equipment in the operational facility. It was critical to position the new structure directly next to the existing building. Minipiles or larger diameter piles would also have been unsuitable due to the predominantly granular material containing many cobbles and boulders. These ground conditions are ideal for micropiles. Glenfiddich Distillery, Dufftown Dufftown, Keith Basement Retention Drilled Micropiles Robertson C