Case Study

Bearing Piles To Support Building Load

Bearing Piles To Support Building Load

Pages 2 Pages

www.technikgs.com Case study LOCATION REQUIREMENT TECHNIQUES MAIN CONTRACTOR Project Overview This multi-storey property was being renovated which involved the reconfiguration of the superstructure and enhancement of the existing foundations. The works involved piled foundations for additional new independent columns and for upgrading of existing columns. These works were required to be undertaken within a 3m headroom within the under-croft/ basement. Residential Development, Dollis Park Dollis Park, London Bearing piles to support increased building load Bottom Driven Montway LimitedGROUND SOLUTIONS www.technikgs.com Case study Northern Office 01928 579464 Southern Office 0207 559 3425 Scottish Office 0141 637 2826 info@technikgs.com Project Challenges • Rest

Join for free to read