Case Study

GLENEAGLES, AUCHTERARDER, SCOTLAND

GLENEAGLES, AUCHTERARDER, SCOTLAND

Pages 2 Pages

GLENEAGLES, AUCHTERARDER, SCOTLAND OCTOBER 2016 Project Description: Phased refurbishment of 34 Bedrooms Kooltech Involvement: RSP invited Kooltech in early at the design stage to consider possible solutions to address some of the key issues they were facing. Each bedroom was served by a single Concealed Floor Standing VRF Indoor unit with a Kooltech KS9 Discrete return air button sensor and a PAC-YT52CRA simplified controller to allow the occupants to control the temperature within the room. Each indoor unit was connected to the vin card entry system via a 5 Wire adaptor. There was a similair set up for the front of house and the Cocktail Bar excluding the 5 wire adaptors. Client: Gleneagles Hotel Principle Contractor: Thomas Johnstone M&E Contractor: ECG Consultant: RSP Consulting

Join for free to read