Glastonbury Multi-Use Path

Glastonbury Multi-Use Path

Pages 1 Pages

Challenge A safe and durable boardwalk section was needed to extend a new multi-use path through a protected wetland area in Glastonbury, CT. The boardwalk required a live load design to account for a 10,000 lb. vehicle (H5 truck). Construction efforts on the boardwalk system needed to minimize disturbance to this environmentally sensitive area. Furthermore, the original boardwalk trail design included challenging horizontal and vertical alignment changes. The Town of Glastonbury needed a product with engineered design flexibility to fit the multi-use path’s original layout. Solution Glastonbury’s engineers selected a skid-resistant Sandblast finish to help prevent bike tires from losing their grip on a winding trail design - even in shady, wet areas. Cast-in-place concrete piles