Case Study
Glass Manufacturing Facility Installs New Heating Equipment —Saves $813,000 Annually
©2016 Solution Dynamics, LLC CASE STUDY: HEATING INFRASTRUCTURE IMPROVEMENTS SYSTEM TYPE: Heating Units, Boilers, and Gas Meters GLASS MANUFACTURING Facility Installs New Heating Equipment — Saves $ 813,000 Annually System Opportunities ? Two older 34,000 lb/hr steam boilers with limited turndown capability ? Steam distribution system with potential future piping issues ? Condensate return around 60% ? Old boiler economizers that wer