Case Study

Glass Manufacturing Facility Achieves Energy Savings Of $613,000 Annually With A Boiler System Project —Simple Payback Of 1.45 Years.

Glass Manufacturing Facility Achieves Energy Savings Of $613,000 Annually With A Boiler System Project —Simple Payback Of 1.45 Years.

©2016 Solution Dynamics, LLC CASE STUDY: DIRECT-FIRED HEATING SYSTEM SYSTEM TYPE: Boilers GLASS MANUFACTURING Facility Achieves Energy Savings of $ 613,000 Annually with a Boiler System Project — Simple Payback of 1.45 Years. System Opportunities ? Two older 34,000 lb/hr steam boilers with limited turndown capability ? Steam distribution system with potential future piping issues ? Condensate return around 60% ? Non functional boil

Join for free to read