Case Study

Glascoed Water Treatment Works

Glascoed Water Treatment Works

Pages 4 Pages

TransPAC Case Study Glascoed Water Treatment Works ejector solutionsWelsh Water - Glascoed Water Treatment Works The water treatment plant was facing closure due to a spike in pesticide concentration found in the raw water supply entering the works. Due to tough constraints on allowable pesticide concentrations, which have to be below 0.1µg/l, the site was nearing an enforced shut down. Transvac were able to provide and install a TransPAC car

Join for free to read