Case Study
Production Boosting - North Sea
Production Boosting Case Study Undisclosed, North Sea ejector solutionsApplication The client was proposing to do a coil tubing production log of a Well that doesn’t flow naturally. The Well was normally gas lifted, but due to the configuration of the Well they cannot operate the gas lift system with the coil tubing in place. The requirement was to find a temporary method of maintaining production from the Well during the re-work. Separator L