“Track Removal and Reinstatement to facilitate the bridge infill” George Street Blackburn George Street Blackburn T he existing FHR4 Br 28 was in poor condition throughout with extensive corrosion and section losses to metallic elements. The main works consisted of infilling the structure and the removal of the remaining steel sections. To facilitate the main works, Pod- Trak undertook the removal of the existing track and reinstallation following the infill. Prior to core weekend, the new track alignment for the Up and Down Goods Loop and the East Lancs Siding was set out. During the core possession works the existing track was removed with all serviceable materials stored on site for installation following the infill. Once removed, Pod-Trak left site for 12hrs whil