Case Study

Generating a Full Field Development Plan in a Highly Restricted Urban Drilling Location

Generating a Full Field Development Plan in a Highly Restricted Urban Drilling Location

Pages 2 Pages

www.pdgm.com The Challenge The project conducted by Integrated Petroleum Technologies Inc. for Mineral Resources Inc. is unique because the vast majority of the 10 square mile acreage is literally under the city of Greeley, Colorado. Historically, development in this urban environment was restricted by limited surface drilling locations, effectively leaving a significant development hole in the heart of the DJ Basin’s Wattenberg field. To

Join for free to read