Case Study

Gemini Retrievable Bridge Plug Deployment

Gemini Retrievable Bridge Plug Deployment

Omega Case History Key Information • Run and set Gemini Retrievable Bridge Plug between two separate sand screen sections. • Plug off lower water producing zone. • Run entire operation together will well tractor to reach target setting depth. Objectives • Client: Statoil • Location: Norway • Field: Statfjord • Well: A-11 BT2 • Well Type: Oil Producer • Setting Depth: 4550 mMD • Tubing Details: 4-1/2” 12,6 lb/ft Results Gemini Retrievable Bridge Plug Deployment. Rev 001 29/06/2015 • Plug successfully deployed together with tractor to target setting depth. • HST Setting Tool successfully activated through e-line shooting panel. • Plug successfully set and HST Setting Tool retrieved. • 2.7” Omega HST Setting Tool • 3,42” Omega Gemini Retrievable Bridge Plug Tooling Informat

Join for free to read