Case Study

Galvanised plate drying refurbishment pays back in only 20 months

Galvanised plate drying refurbishment pays back in only 20 months

Pages 2 Pages

Galvanised plate drying refurbishment pays back in only 20 months Refurbishment of dehumidifier: • ROI at only 20 months • Shorter drying times, increasing production capacity • Utilising warm waste water to reduce costs of rotor regeneration • Internal Rotor Energy Purge for further reduction of heating costs • Update of control system enables communication with CTS system Case Study: Niko NV, Belgium Galvanised plate drying refurbishment The Belgian company Niko NV delivers more than 5000 products and solutions for switching materials, door communication systems, lighting control and home automation systems and has branch offices in Europe and a wide network of agent and distributors. At Niko’s manufacturing plant in Belgium attention is paid to control and minimize the im

Join for free to read