Case Study
From Object Based Design To Scheduling
The Requirement HOK had a project for the fitting out of a large new college in Doha. In order to achieve the project timescales it was necessary to commence the project rapidly, produce schedules as efficiently as possible and ensure that the schedules were detailed and reliable throughout the revision process. The Solution A building information modeling solution, Architectural Desktop, was chosen as it provided a familiar CAD interface with th