Case Study
Frito Lay
Case Study: Frito Lay Headquarters Plano, Texas Features: • Solar water-heating appliance provides immediate savings on electric costs • 25-year lifetime of the appliance • Solar energy delivered – First year: 87,000 kWh Design capacity: 121,000 kWh • Expandable design allows facility to accommodate larger water loads in the future and further reduce energy costs. Expansion to ?tness center in 2009 • Retro?t design plumbs into exist