Case Study
FracPoint System Combined With Alternate Techniques Provided More Stages and Increased Production
Benefits ? Increased production rates ? Combined openhole packer completions with plug-and-perf completions to increase overall number of fracturing stages ? Lowered operational cost – Eliminated cementing operations – Reduced pumping time Background and challenges ? Located in the Bakken Shale ? Limited availability of fracturing crews, and over pressurized formations ? Client wanted to reduce overall cost of completion by maximi