Case Study
FracPoint EX-C System Enabled 40-Stage Fracture Treatment in 1.2 Days
Case History Benefits ? ? Completed an industry-first 40-stage frac job with ball-activated frac sleeves ? ? Saved 5 days by completing frac job in 1.2 days compared to 6.2 days if done with plug-and-perf ? ? Lowered operational cost through increased job efficiency ? ? Eliminated perforating, wireline, and coiled-tubing operations along with associated costs Background and challenges ? ? Bakken shale, Williston basin, North Dakota ? ?