Case Study
FracPoint MP Sleeve System Reduced Total Frac Time by 50% in Oklahoma’s Mississippian
CASE HISTORY | bakerhughes.com Benefits ? ? Reduced total frac time: 15 hours with FracPoint MP system versus 30 hours for plug-and-perf method ? ? Reduced frac fleet time on location ? ? Eliminated wireline expense ? ? Reduced water usage Well Background and Challenges ? ? Woods County, Oklahoma ? ? 5,784-ft total vertical depth and 10,710-ft TMD ? ? 4,500-ft horizontal section ? ? Customer needed 40 fracture entry points ? ? Operator need