Case Study
FPSO Stybarrow Venture MV16 Internal Disconnectable Turret Stybarrow Field, Australia
Scope of Work SOFEC designed, constructed and supplied a disconnectable internal turret mooring system to moor a 150,000 dwt MODEC newbuild FPSO in 825m (2,706ft ) water depth. General Description Client Name: BHP Billiton Petroleum Contract Award: March 2006 Installation Date: September 2007 First Oil: November 2007 Vessel Size: 160,000 dwt Storage Capacity : 900,000 bbls Water Depth: 825m (2,706ft ) Supply / Fabrication: Turret - Mala