Case Study
FPSO PazFlor Spread Mooring
Scope of Work SOFEC is responsible for the design spread mooring piles, mooring legs, pull-in and installation equipment for the FPSO. Located 150 kilometers off shore Angola, Paz? or comprises four reservoirs covering an area of 600 square kilometers, lying under 1,200 to 2,100 meters of sediment in water depths of 600 to 1,200 meters. The SOFEC spread mooring system will be BV classed. General Description Client Name: DSME (EPC) TOTAL (Own