Case Study

FPSO Kizomba B Spread Mooring

FPSO Kizomba B Spread Mooring

Pages 1 Pages

Scope of Work Contracted through Hyundai Heavy Industries, SOFEC was responsible for the design and analysis of the Kizomba B FPSO spread mooring system. The Kizomba B FPSO is a near-identical copy of the Kizomba A FPSO. The supply of the off -vessel equipment (wire, chain, piles) as well as the installation of the system was once again the responsibility of the EPC3 installation contractor. The SOFEC spread mooring system is DnV class

Join for free to read