Fort Worth Residence Waterfall - Fort Worth, Texas • The ICF installation time included pouring concrete on upper deck area.

Fort Worth Residence Waterfall - Fort Worth, Texas • The ICF installation time included pouring concrete on upper deck area.

NUDURA Project Profile 866-468-6299 www.nudura.com FAST FACTS Fort Worth Residence Waterfall - Fort Worth, T exas • The ICF installation time included pouring concrete on upper deck area. Completion took an extraordinary amount of time because the project was largely constructed on weekends. • A significant amount of radius block was utilized for the retaining walls. Most of the retaining walls were 12” core, but some areas of lower heights were 8” and 6” core. • The project only had one door buck and no windows. The walls were deliberately not straight and also leaned toward the hill four inches out of plum. PROJECT STATISTICS Location: Fort Worth, T exas Type: Specialty Applications Size: 2,580 sq ft ICF Use: 2,300 sq ft (Waterfall, Pump Room, Rataining walls) Total Co