Case Study

FLEXPump ER solution replaces rod pump, increases daily revenue by $40,000

FLEXPump ER solution replaces rod pump, increases daily revenue by $40,000

Pages 2 Pages

FLEXPumpER solution replaces rod pump, increases daily revenue by $40,000 Challenges • Reservoir conditions fluctuated and required wide operating range • Well geometries were complex • Operator required additional motor cooling options for varying flow rates and higher operating temperatures Results • Increased production 1,000 BOPD when artificial lift changed from rod lift to FLEXPumpER technology • Equipment string handled doglegs with maximum 9°/100 ft Introduction In 2015, the Artificial Lift Systems team of Baker Hughes, a GE company (BHGE), was challenged by a major operator in the UK to design an electrical submersible pumping (ESP) system to deliver a wide range of production rates in an application where well performance and reservoir potential remained hu

Join for free to read