Case Study

Flensburger Shipyard: Flensburg, Germany

Flensburger Shipyard: Flensburg, Germany

Unrestricted © Siemens AG 2015. All rights reserved. • Shore connection for powering ships in the shipyard with different voltages (400 V/50 Hz, 440V/60 Hz, 690 V/60 Hz) from the 50-Hz shipyard grid • Power capacity of 1 MVA needed • No space on the available surface • Need to ensure power recovery from the on-board generators to the shipyard grid while testing the generators of the ships • Maximum acoustic pressure level of 45 dB(A) at a dista

Join for free to read