Case Study
Airbus Data Center, Hamburg, Germany
Challenge • Modernization of a data center power supply • Power supply solution with communications-capable modules for integrating the power supply into the data center’s building control system • Use of busbar system instead of cables to reduce the fire load in the building • Greater operating reliability of the power supply system leading to higher availability of the connected computers Solution Totally Integrated Power reference Airbus Da