Case Study

Fast Connect Wellhead Saves PetroMiranda USD 1.2 Million Annually in Heavy Oil Field, Venezuela

Fast Connect Wellhead Saves PetroMiranda USD 1.2 Million Annually in Heavy Oil Field, Venezuela

Pages 2 Pages

CASE STUDY CHALLENGE Provide PetroMiranda in Venezuela a wellhead that can: ¦ Withstand the high temperatures and corrosive environments of heavy oil wells ¦ Optimize rig time ¦ Eliminate the use of expansion joints. SOLUTION Engineer the Fast Connect wellhead to satisfy all PetroMiranda’s requirements. RESULTS ¦ Delivered a custom wellhead rated 650 degF ¦ Reduced wellhead installation time by 67%, saving USD 1.2 million annually ¦ Sh

Join for free to read