Case Study
Fast Connect Wellhead Saves PetroMiranda USD 1.2 Million Annually in Heavy Oil Field, Venezuela
CASE STUDY CHALLENGE Provide PetroMiranda in Venezuela a wellhead that can: ¦ Withstand the high temperatures and corrosive environments of heavy oil wells ¦ Optimize rig time ¦ Eliminate the use of expansion joints. SOLUTION Engineer the Fast Connect wellhead to satisfy all PetroMiranda’s requirements. RESULTS ¦ Delivered a custom wellhead rated 650 degF ¦ Reduced wellhead installation time by 67%, saving USD 1.2 million annually ¦ Sh