Case Study

Farnham STW Storage Silo with Sliding Frame Discharge

Farnham STW Storage Silo with Sliding Frame Discharge

Farnham STW Storage Silo with Sliding Frame Discharge The Thames Water Trident Alliance chose Saxlund International to supply this prestigious and unusual limed sludge cake handling system at their Farnham site. Because of a maximum building height on the site and since the silo had to store 800m³ of limed cake material, it was necessary to supply a silo with an 11 meter diameter. To achieve this, Saxlund chose their patented two element

Join for free to read