CASE STUDY Office Address: McGowan Ltd, Unit 16, DalfaberIndustrial Estate, AviemorePH22 1ST Telephone: 01479 812170 // Email: info@mcgowanltd.co.uk www.mcgowanltd.co.uk Location: Inverness area Type of works: Burn Restoration Works McGowan Ltd were approached to undertake the restoration works to the existing burn, as the existing burn banks were badly eroded though high water levels during heavy rains in the area. Throughout the reinstatement works silt mitigation methods were adopted on site and were inspected and maintained on a daily basis throughout the construction phase. Working to Client’s design brief, suitable stone was sourced and selected for use in the formation of In-Burn step pools and burn edge protection. Existing eroded riverbanks were carefully re-graded to prov